Why is the substructure vital in microcement?
Microcement is a thin coating (2 to 3 mm).
This means 👇
If the bottom layer has a problem, all that problem is transferred to the final layer ⚠️
Proper infrastructure will:
Don't create cracks ❌
The surface should not peel ❌
Keep the color uniform.
The duration of implementation is guaranteed for several years 🕒
For this reason, in professional implementation, the infrastructure occupies more than 50% of the project time.
initial inspection of the surface; The first and most important step
Before doing anything, the surface should be carefully checked 🔍
Things to check:
Existence of active or inactive crack
Dandruff, humidity or moisture
Looseness of the surface
balance difference
Substrate material (concrete, cement, tile, plaster, etc.)
⚠️ Applying microcement on an unstable surface = failure of the project
What steps does microcement standard infrastructure include?
Step 1: Cleaning and surface preparation
Level should:
Free from dust 🧹
Without fat and oily substances
No peeling paint
At this stage sometimes need:
Sabzani
Wash it
Primary repair
There is.
Step 2: repairing cracks and defects
All cracks (even small cracks) must be repaired 🧱
Basic method:
Open crack
Filling with restorative mortar
Using concrete glue or resin
❌ Not filling the crack = cracking of microcement in the future
Step 3: Implementation of specialized primer
Primer is the bridge between the surface and microcement 🔗
Primer duties:
Increase adhesion
Uniform surface absorption
Preventing the separation of layers
The type of primer is different depending on the surface:
Primer for concrete
Tile primer
plaster primer
anti-moisture primer
Step 4: Implementation of fiberglass mesh (critical step)
🚨 The most important part of infrastructure is this stage.
Fiberglass mesh:
Diffuses tensions
Prevents hair cracks
multiplies the strength of the final layer
❌ Remove the mesh = definitely leave in the future
(This mistake is very common in non-professional performances)
Step 5: smoothing layer and final leveling
At this stage:
Unevennesses are removed
The surface is completely leveled
A suitable substrate is created for the implementation of microcement
✨ The result: a surface ready for professional performance
The difference between microcement foundation on the floor, wall and ceiling
Floor infrastructure
The floor bears the most pressure 👣
Features of floor substructure:
High strength
Exact alignment
Reinforced mesh
Special attention to expansion joints
The smallest fault in the floor will become very clear later ⚠️
Wall infrastructure
On the wall:
Hair cracks are very common
Mesh plays a vital role
Uniformity of the surface is important
Principle implementation causes:
Don't cast a shadow
Don't create a wave
The final color should be seen beautifully 🎨
Roof infrastructure
The ceiling is the most difficult part of the performance 😮
Challenges:
Gravity
dropping
Structural cracks
Here only professional team can give standard result.
Microcement foundation on different surfaces
Implementation of microcement on ceramic tiles
✔️ is possible
❌ Without proper infrastructure = disaster
Specific steps:
Roughening the surface
Special primer
Double mesh in the seams
Implementation of microcement on plaster
Surface plaster is sensitive ⚠️
Execution condition:
Completely dry plaster
Isolated primer
Remove weak points
Common mistakes in microcement infrastructure ❌
🚫 removal of fiberglass mesh
🚫 Fast execution without drying time
🚫 Use of inappropriate primer
🚫 Running on a wet surface
🚫 Seeing the floor and the wall the same way
These mistakes usually show themselves after a few months 😔
Why is Decamo Cement's professional infrastructure different?
The difference between professional and ordinary performance is exactly here 👇
✔️ Detailed examination of the level before the contract
✔️ Selection of material suitable for the project
✔️ Full implementation of all infrastructure steps
✔️ Not removing any step to reduce cost
🎯 Result: lasting and effortless performance

Final summary
If you only remember one thing from this article, it will be this:
Good microcement starts with a good foundation.
Basic infrastructure means: ✅ high durability
✅ Lasting beauty
✅ no cracks and crusts
✅ real satisfaction of the employer
And this is exactly where a professional implementation makes sense ✨